Gresik, Jawa Timur · 2,200 MW · commissioned 1993 · PLN — Thermal
Continuous emissions vs. DENR permit limits
PLTGU Gresik · 1652 MW avg
4 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 550 MW | 413.8 MW | 539° | 169 bar | 1282.8 t/h | 42% |
| Unit 2 | Running | 550 MW | 396.9 MW | 544.3° | 168.7 bar | 1230.4 t/h | 41.5% |
| Unit 3 | Running | 550 MW | 392.2 MW | 543.9° | 168.6 bar | 1215.8 t/h | 41% |
| Unit 4 | Maintenance | 550 MW | 0 MW | 132.3° | 2.8 bar | 0 t/h | 0% |