Cilegon, Banten · 3,400 MW · commissioned 1984 · PLN — Thermal
Continuous emissions vs. DENR permit limits
PLTU Suralaya · 2782 MW avg
7 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 485.7 MW | 428.6 MW | 544.1° | 170.6 bar | 1328.7 t/h | 42.6% |
| Unit 2 | Running | 485.7 MW | 418.8 MW | 539.8° | 170.3 bar | 1298.3 t/h | 41.8% |
| Unit 3 | Running | 485.7 MW | 432.3 MW | 540.8° | 170.7 bar | 1340.1 t/h | 42.4% |
| Unit 4 | Running | 485.7 MW | 403 MW | 541.6° | 170 bar | 1249.3 t/h | 42.4% |
| Unit 5 | Running | 485.7 MW | 430.1 MW | 542.6° | 170.6 bar | 1333.3 t/h | 41.9% |
| Unit 6 | Running | 485.7 MW | 416.7 MW | 545.8° | 170.3 bar | 1291.8 t/h | 42.6% |
| Unit 7 | Running | 485.7 MW | 406 MW | 542.8° | 170 bar | 1258.6 t/h | 42.2% |