Paiton, Probolinggo, Jawa Timur · 800 MW · commissioned 1994 · PLN — Thermal
Continuous emissions vs. DENR permit limits
PLTU Paiton · 621 MW avg
2 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 400 MW | 321.8 MW | 541.9° | 169.7 bar | 997.6 t/h | 41.4% |
| Unit 2 | Running | 400 MW | 313.7 MW | 542.1° | 169.4 bar | 972.5 t/h | 41% |