Pluit, Jakarta Utara · 1,200 MW · commissioned 1979 · PLN — Thermal
Continuous emissions vs. DENR permit limits
PLTGU Muara Karang · 564 MW avg
3 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 400 MW | 318 MW | 538.4° | 169.5 bar | 985.8 t/h | 42.2% |
| Unit 2 | Running | 400 MW | 317.9 MW | 539.2° | 169.5 bar | 985.5 t/h | 41.5% |
| Unit 3 | Standby | 400 MW | 0 MW | 150.5° | 5.7 bar | 0 t/h | 0% |