Kepahiang, Bengkulu · 210 MW · commissioned 2005 · PLN — Hydro
Current 643.4 MASL · 86% of operating band
PLTA Musi · 122 MW avg
2 turbine-generator units
| Unit | Turbine | Status | Rated | Output | Gate | RPM | Efficiency | Bearing °C |
|---|---|---|---|---|---|---|---|---|
| Unit 1 | Pelton | Running | 105 MW | 83.8 MW | 82.9% | 600 | 89.5% | 65.5° |
| Unit 2 | Pelton | Running | 105 MW | 85.1 MW | 83.6% | 600 | 90% | 63.9° |