6 hydroelectric plants · 2.33 GW installed across Indonesia
6 hydroelectric plants
6 plants · 2,329 MW installed · 1,394.6 MW current output
| Units | Commissioned | ||||||
|---|---|---|---|---|---|---|---|
PLTA Cirata Jawa Barat | Running | 1,008 MW | 625 MW | 38% | 4 | 1988 | |
PLTA Saguling Jawa Barat | Running | 700 MW | 385 MW | 41% | 4 | 1985 | |
PLTA Musi Bengkulu | Running | 210 MW | 170.1 MW | 58% | 2 | 2005 | |
PLTA PB Soedirman (Mrica) Jawa Tengah | Partial | 180 MW | 86.4 MW | 44% | 4 | 1989 | |
PLTA Bakaru Sulawesi Selatan | Maintenance | 126 MW | 50.4 MW | 54% | 3 | 1991 | |
PLTA Sutami Jawa Timur | Running | 105 MW | 77.7 MW | 52% | 3 | 1972 |